Global engineering, real results.

About Global Engineering
At Factiun, we put all our experience at the service of our clients. Our goal: to define and implement the most efficient solution, tailored to the specific needs of each project.
Working model
To achieve this, we follow a working model divided into three key phases.

01 Initial phase
Characterisation and prospecting
We precisely define the project’s constraints in order to make decisions on a solid basis.
This includes:
Geotechnical and hydrological study (including soil corrosivity).
POT study.
Atmospheric corrosion study.
Topographical study.
Climatic study and analysis of local wind intensity.
Other specific studies depending on location.
02 Project phase
Detailed engineering and calculation
We convert the results of the initial phase into a fully defined technical project.
Layout design and adaptation to the topography of the site.
Calculation of foundations and proposed execution according to previous studies.
Calculation and design of solar trackers considering technical constraints.
Complete development of technical documentation: plans, manuals, reports, and construction details.


03 Implementation phase
On-site support
During implementation, we ensure correct deployment and provide support in the event of any incidents or deviations.
Swift resolution of unforeseen events.
Technical adjustments to planned solutions.
Ongoing support for the client and the construction team.