POT Campaigns
Accuracy from the ground up.

FACTIUN technician supervising pile driving test at dawn on the test field.

At FACTIUN, we know that the success of any structure begins long before the first post is placed. POT (Pull-Out Test) campaigns are the key step in ensuring that the foundation is perfectly suited to the actual ground conditions.

What are we looking for with a POT campaign?

Drilling machine performing foundation testing for the FACTIUN solar structure.

Define the optimal foundation

Direct driving, pre-drilling or micropiles: we choose the most efficient solution based on the resistance of the ground.

FACTIUN technicians conducting extraction tests to measure soil compaction.

Assess the driveability of the ground

We identify areas with a higher probability of rejection and the boundary between driveable and non-driveable ground.

FACTIUN operator checking the depth of embedding in agricultural land.

Determine the ideal depth

We calculate the minimum embedment required based on the strength of the soil and the loads it must bear.

FACTIUN test posts installed in the field for structural validation.

Validate the design in real conditions

Tests with different profile sections and depths to confirm soil-structure behaviour.

FACTIUN test of structural behaviour in wet terrain with cloud cover.

Adapt to special condition

A strategic approach to the POT campaign allows us to

In short, we design and build on certainties, not assumptions.

Factiun
Linked LinkedIn